Difference between revisions of "Bridge Construction"

From Ragnarok Project Zero wiki
Jump to navigation Jump to search
 
Line 19: Line 19:
 
#:[[File:Grocer Kurt.jpg|none]]
 
#:[[File:Grocer Kurt.jpg|none]]
 
#*Go back to the bridge area and put the ropes in the pile of ropes {{navi|lhz_fild02|226|227}}.
 
#*Go back to the bridge area and put the ropes in the pile of ropes {{navi|lhz_fild02|226|227}}.
 +
[[Category:Lighthalzen Quests]]

Latest revision as of 11:05, 14 January 2023

Bridge Construction
Requirements
Base Level: Level 100+
Rewards
Base Experience: 1.500.000 Base EXP
  1. Talk with President Eight lhz_fild02225239, he will ask you to deliver 3 type of materials to build the bridge.
    President Eight.jpg
  2. Timber Delivery: President Eight asks you to bring him 10 pieces of Construction Wood. Remember to have atleast 2000 Weight available.
    • Go to Woodcutter Iron lhz_fild0184235 and pick up the wood.
    Woodcutter Iron.jpg
    • Go back to the bridge area and put the wood in the pile of wood lhz_fild02226231.
  3. Brick Delivery: President Eight asks you to bring him 10 pieces of Construction Bricks. Remember to have atleast 2000 Weight available.
    • Go to Bricklayer Cemen lhz_fild03288364 and pick up the bricks.
    Bricklayer Cemen.jpg
    • Go back to the bridge area and put the bricks in the pile of bricks lhz_fild02226235.
  4. Rope Delivery: President Eight asks you to bring him 10 pieces of Construction Ropes. Remember to have atleast 2000 Weight available.
    • Go to Grocer Kurt lhz_fild02116242 and pick up the ropes.
    Grocer Kurt.jpg
    • Go back to the bridge area and put the ropes in the pile of ropes lhz_fild02226227.